CORE CAPABILITY

Concrete & Foundations

Concrete and foundations are the most schedule-critical and quality-sensitive scopes on any heavy civil or industrial project. We self-perform this work with our own crews, our own equipment, and PE-engineered designs -- because the difference between a foundation that performs for 50 years and one that causes problems in 5 comes down to the team that designed and poured it.

150K+CY Concrete Capacity

What we deliver.

Spread footings & grade beams

Conventional foundation systems for steel structures, tilt-up panels, and equipment pads. PE-designed for specific soil conditions and loading requirements.

Mat foundations

Large-area continuous foundations for heavy equipment, data halls, and process areas where differential settlement must be controlled to tight tolerances.

Pier & drilled shaft foundations

Deep foundation systems for high-load applications, poor soil conditions, or sites where shallow foundations are not feasible. Installed with our own equipment.

Slab-on-grade

Industrial-grade floor slabs with fiber reinforcement, vapor barriers, and precision finishing for flatness and levelness tolerances.

Equipment pads & pedestals

Precision-formed foundations for mechanical equipment, generators, transformers, switchgear, and process equipment with embedded anchor bolts and conduit routing.

Retaining walls

Cast-in-place, segmental, and MSE retaining wall systems for grade changes, loading dock walls, and site infrastructure.

Projects in this market.

Data Center
$17B

Project Sail

Coweta County

13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.

Data Center
$1B+

QTS Excalibur

Fayetteville

16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.

Data Center
$800M+

T5 ATL IV

Palmetto

91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.

Manufacturing
$5B

Rivian EV Plant

Social Circle

Massive EV manufacturing campus on 2,000 acres east of Atlanta. DOE $6.6B loan secured. Construction resumed 2025.

Data Center
$1.15B

DC BLOX ATL

Lithia Springs

Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.

Industrial
$500M+

Cubes at Bridgeport

Newnan

Mega industrial park at I-85 Exit 41. Amazon 1M SF tenant. Scout Cold Logistics. Approximately 6M SF of development remaining.

Request a project review.

Share the site, scope, and target start. Bolt will tell you quickly how we would approach the work.

(706) 809-0808