DELIVERY METHOD

Design-Build Construction

Design-build eliminates the gap between design and construction by placing both under a single contract with one accountable team. At Bolt, that means PE-licensed engineers and self-perform crews working together from preconstruction through commissioning -- no finger-pointing, no coordination failures, no surprises. Research from the Construction Industry Institute confirms what we see in the field: design-build delivers projects 33.5% faster with 6.1% lower cost than traditional design-bid-build.

33%Faster than Traditional Delivery

What we deliver.

Single-source accountability

One contract, one team, one standard. The firm that designs the project is the firm that builds it. No coordination gaps between architects, engineers, and contractors.

PE-stamped engineering

Licensed professional engineers develop structural calculations, foundation designs, and construction documents in-house -- integrated with field operations from day one.

Value engineering

Our engineers optimize designs for constructability before breaking ground. We identify cost savings and schedule compression opportunities during preconstruction -- not as change orders during construction.

Budget certainty

Design-build provides a guaranteed maximum price earlier in the process. Our self-perform model gives us direct cost control on 40-60% of total project value, reducing the unknowns that drive cost overruns.

Accelerated schedule

Phased design release and parallel-path construction start work months before traditional delivery. CII research documents 33.5% faster completion versus design-bid-build.

Quality control

The engineers who design the foundation are the same people who inspect the rebar and watch the pour. Self-perform construction eliminates the quality gap between design intent and field execution.

Projects in this market.

Data Center
$17B

Project Sail

Coweta County

13-building hyperscale campus on 832 acres off US-27 near Plant Yates. Largest proposed data center in Georgia. $163M/yr projected tax revenue.

Data Center
$1B+

QTS Excalibur

Fayetteville

16-building mega-campus on 615 acres. Georgia Power building third substation on-site. Active construction through 2032.

Data Center
$800M+

T5 ATL IV

Palmetto

91-acre campus in South Fulton County. On-site substation operational 2026. Phase 1 delivery 2027. AI-ready with liquid cooling.

Energy Storage
$2B+

GA Power BESS

6 Sites Statewide

Largest battery storage deployment in the Southeast. 765 MW under construction. 3,000+ MW additional planned through IRP.

Manufacturing
$5B

Rivian EV Plant

Social Circle

Massive EV manufacturing campus on 2,000 acres east of Atlanta. DOE $6.6B loan secured. Construction resumed 2025.

Data Center
$1.15B

DC BLOX ATL

Lithia Springs

Hyperscale campus in Douglas County. $1.15B green loan financing closed Aug 2025. Greystone Power as utility provider.

Request a project review.

Share the site, scope, and target start. Bolt will tell you quickly how we would approach the work.

(706) 809-0808